> Gas is the cheapest, fastest zero-to-production choice for onsite power generation, and has been for a long time.
Last I heard the wait time for turbines was ~5 years at the moment. I'm sure MSFT has some inside baseball with Chevron but it doesn't work as a general rule of thumb.
Last I heard the wait time for turbines was ~5 years at the moment. I'm sure MSFT has some inside baseball with Chevron but it doesn't work as a general rule of thumb.